THE LIANYI GROUP

Let’s make the world a better place together !
Black Corrosion Resistant Gravel Driveway Geocell
Home » Products » Geocell » Black Corrosion Resistant Gravel Driveway Geocell

loading

Share to:
sharethis sharing button

Black Corrosion Resistant Gravel Driveway Geocell

Geocell Geoweb, Geocell Gravel Grid, Geocell Used in Road Construction manufacturer / supplier in China, offering Stabilizer Gravel Geonet/HDPE Plastic Geocell, an-Ti Grass Cloth Used in Garden, Waterproof Geomembrane HDPE/LDPE Membrane /Geogrid/Geotextile
Availability:
Quantity:
  • HDPE


Black Corrosion Resistant Gravel Driveway Geocell


Black Corrosion Resistant Gravel Driveway Geocell

Basic Info

  • Model NO.: GEOCELL-450150

  • Application: Retaining Wall, Railway, Highway, Road

  • Feature: Corrosion Resistant, Chemical Stability

  • HS Code: 3926909090

  • Specification: TGGS75-400, TGGS50-400

  • Filler: Plastic

  • Function: Distributing Load, Anti-deforming

  • Material: HDPE

  • Transport Package: Belt

  • Origin: Shandong China

Product Description
3D GEOCELL
Geocell is made of HDPE reinforced sheet material, A three-dimensional mesh cell chamber formed by welding of high strength.Generally by the ultrasonic pin type welded together.Due to the need of engineering, some holes on the diaphragm.
  Geocell photo
   
26=    

Geocell technical data
Type Cell Depth mm weld spacing
mm
Seam Peel strength
N ≥

TGGS200-330

200

330

2840

TGGS150-330

150

330

2130

TGGS100-330

100

330

1420

TGGS75-330

75

330

1065
TGGS50-330 50 330 710
TGGS200-400 200 400 2840
TGGS150-400 150 400 2130
TGGS100-400 100 400 1420
TGGS75-400 75 400 1065
TGGS50-400 50 400 710


Application of HDPE plastic geocell used in roadbed  reinforcement



1. processing  half  fill Semi roadbed
build up the embankment on the ground on the slopes of the natural slope ACTS in 1:5, supporting subsoil should dig the steps, The step width shall be less than 1 m, when building or rebuilding roads widened by installments, Convergence between the new and old roadbed fill slope ,should dig the step, high grade highway width is 2 m,  laid large geocell in each of the steps horizontally, using the large geocell  of their own facade confining reinforcement effect, better solve the problem of uneven settlement

2. subgrade in wind drift sand region
Sand subgrade should be given priority to with low embankment, region filling height not less than 0.3 m. generally due to its low subgrade, sand subgrade construction in professional requirements and heavy load, adopting large chamber loose packing confining effect, can be in limited the height of the roadbed with high stiffness and strength, to inherit the load stress of large vehicles.
3. Reinforced back subgrade soil
Using large geocell  can better achieve the goal of  abutment back reinforced ,  can generate enough friction between the geocell and packing .  and effectively reduce roadbed uneven subsidence, finally can effectively relieve the abutment jump car "disease early impact damage of bridge deck.
4. subgrade in permafrost region
In permafrost regions fill roadbed construction, should reach a minimum filling height in order to prevent or cause a frozen layer ceiling Frothing decreased, resulting in an excess of embankment settlement occurs. Geocell unique overall unconfined facades reinforced effect and effectively implemented, can ensure a minimum filling height in some special area to the maximum extent, and to fill a high-quality strength and stiffness.
5. The collapsibility loess roadbed treatment
When the highway and the highway collapse loess and loess lot better compression by wet, or foundation bearing capacity is lower than the high embankment to allow third-party vehicle load and weight of pressure embankment, subgrade bearing capacity requirements should also for processing, then the superiority of Geocell on manifest is no doubt.

Our service

· The sample is free.
· The quality of our products are qualified.
· Our delivery speed will be the fastest.
· We can provide the most professinal technical guidance and service

FAQ
1. How about the delivery time?
   Lead time since receipt of 30% T/T deposit payment: 3 weeks.
2. What's are the MOQ?
   We can according to your condition to set the MOQ.
   And we can provide you samples for quality inspection.

3. How to deal with the sample charge?
   Accordeing to our company policy, the samples are free, we only charge the freight fee.And we will return the freight fee If you set the order.

4. Can you produce the product according to customers' requirements?
   Sure, we are professional manufacturer, OEM and ODM are both welcome.
Previous: 
Next: 

ABOUT US

THE LIANYI GROUP
Lianyi is a leading manufacturer and supply in the geosynthetics industry,specializing soil reinforcement, road construction ,water management ,drainage etc products.
 

QUICK LINK

CONTACT US
Copyright © 2021 The Lianyi Group All Rights Reserved.
Technology by leadong.com | Sitemap